■ Overview
This project involves the replacement of VCM1 equipment and the installation of an OC reactor at the facilities owned by Thai Plastic & Chemical PCL. The project took place in Map Ta Phut (Rayong) with a total budget of 73 million baht, completed between 2014 and 2015. The goal was to enhance production efficiency and safety by introducing the latest equipment, thereby boosting the company's production capacity.
■ Features
A customized equipment replacement process tailored for Thai Plastic & Chemical PCL
Project management system designed to ensure the smooth execution of large-scale equipment replacement
Integration of the latest technology to improve productivity and minimize risks
Strict adherence to safety standards in construction management and trial runs
Project completed on schedule with successful cost management
■ Specifications
Project Name: VCM1 Equipment Replacement and OC Reactor Installation
Location: Map Ta Phut (Rayong)
Total Budget: 73 million baht
Project Timeline: Started in 2014, completed in 2015
Installed Equipment: VCM1 equipment and OC reactor
Client: Thai Plastic & Chemical PCL
■ Usage
This equipment replacement project aims to upgrade the production facilities of Thai Plastic & Chemical PCL, ensuring efficient production of vinyl chloride monomer (VCM). The introduction of the OC reactor, in particular, has helped stabilize the manufacturing process and reduce environmental impact.
Through this project, Thai Plastic & Chemical PCL can now utilize the latest equipment and maintain stable production.
For more details, please download the PDF or feel free to contact us.
■ Overview
The VCM1 Equipment Replacement and OC Reactor Installation Project for Thai Plastic Chemical PCL was undertaken to improve the company's production efficiency and operational stability. The project took place at the MAP TA PUD facility, beginning in 2014 and completed in 2015. Valued at 73,000,000 Baht, this project was part of the facility's equipment modernization, ensuring high construction quality and reliability.
■ Key Features
Efficient Production Process: The newly installed OC Reactor significantly enhanced plastic manufacturing efficiency, contributing to increased production capacity.
Advanced Equipment Replacement Technology: The VCM1 equipment replacement utilized highly durable parts and cutting-edge technology to support long-term operation.
On-Time Project Management: The project was completed within the scheduled one-year period, minimizing construction delays.
High Safety Standards: The construction met stringent safety standards specific to chemical plants, ensuring protection for both workers and equipment.
■ Specifications
Project Name: VCM1 Equipment Replacement and OC Reactor Installation
Location: MAP TA PUD, Rayong
Contract Value: 73,000,000 Baht
Project Duration: 2014–2015
Client: Thai Plastic Chemical PCL
Installed Equipment: VCM1 equipment, OC Reactor, piping
■ Applications
The primary purpose of this project was to streamline the plastic manufacturing line in the chemical plant. With the upgrade of the VCM1 equipment and OC Reactor, the reliability of the manufacturing process was greatly improved, allowing Thai Plastic Chemical to establish a more competitive production line. This led to reduced operational costs and increased production capacity.
This project strengthened Thai Plastic Chemical's competitiveness in the plastic chemical industry through equipment modernization.
For more details, download the PDF or feel free to contact us.
■ Overview
In the VCM1 Equipment Replacement Project, the installation of the OC reactor was carried out as part of the major equipment upgrades for Thai Plastic Chemical PCL. This project aims to enhance the production efficiency of plastic products and ensure long-term operational stability of the plant. Initiated in 2014 and completed in 2015, the project utilized highly reliable equipment and advanced construction technology, playing a vital role in the MAP TA PUD chemical plant.
■ Features
Reliable Equipment Replacement: The replacement of VCM1 equipment significantly improved the plant's production efficiency and safety.
OC Reactor Installation: The installation of the OC reactor with advanced technology enables more efficient process control.
Timely Project Completion: Completed on schedule between 2014 and 2015, the project minimized production impact.
Specialized Technical Expertise: Equipment installation tailored with advanced technical capabilities based on the requirements of Thai Plastic Chemical PCL.
■ Specifications
Project Name: VCM1 Equipment Replacement and OC Reactor Installation Project
Location: MAP TA PUD, Rayong
Contract Value: 73,000,000 Baht
Construction Period: 2014 - 2015
Key Equipment: VCM1 Equipment, OC Reactor
Client: Thai Plastic Chemical PCL
■ Application
This project aims to improve process efficiency in plastic manufacturing, where the installation of VCM1 equipment and the OC reactor plays a key role. It ensures a more stable production line, resulting in cost reduction and productivity improvement. This project marks an important step in optimizing Thai Plastic Chemical PCL's production line and enhancing its competitiveness.
For more details, please download the PDF or feel free to contact us.
| Company name | MAJOR ADVANCE TRADING CO., LTD. | Website URL | https://www.majorflex.com/ |
|---|---|---|---|
| Street address |
258 Moo.1 Tumbol Bankhai, Amphur Bankhai, Rayong Rayong Kingdom of Thailand
[See map] |
Person in charge | Nattaya Phonvichian |
| Telephone number | +66-87-616-2143 | Fax number | |
| Capital | 1,000,000 THB | Employees | Unregister |
| Annual sales | Unregister | EMIDAS Member Number | 105314 |
| Main 3 products |
|
||

MAJOR ADVANCE TRADING CO., LTD.